4.8.25
|
news

our new location

we finally have arrived at our new location and moved to our ultra-modern, attractive company headquarter at bertha-benz-strasse 14 in merklingen. our sensational team mastered the move, hauled boxes, laid cables and set up desks.  we did the automation of the building ourselves, electrical design, programming, control cabinet construction. controls, switches, terminals and other components were installed, wired and neatly installed. the concept is based on our WICKIE M system and helps saving energy and thus emissions. position of the sun for blinds, brightness in the room for lighting and presence forecasts for air conditioning are recorded centrally in order to be used in an energy efficient manner as a result. the interface to our building climatisation enables us to immediately monitor them. we therefore save resources and thus protect the environment.

our new building was supported by the state of baden-württemberg and the european union.

we feel completely at home in the new building!

more insights

blog overview
6.11.25
|
insights

new to our technical documentation team

30.10.25
|
insights

bogy internship at mrm²

20.10.25
|
events

career day technische hochschule ulm

19.9.25
|
events

welcome to merklingen

18.9.25
|
insights

start of training with school bag

14.9.25
|
news

mechatronics internship